Hayley Dingle Phase 2

In 2009 Worcestershire Green Lane Association volunteers carried out improvements to drainage.

Materials and tools were supplied by Worcestershire County Council:

  • Tracked 8 tonne 360° Excavator
  • Wheeled dump truck
  • Pavement roller
  • Drainage tube
  • Stone

The surface of the lane was dug away to bury the drainage tube which exits into a pre-existing culvert. The resulting trench was backfilled with stone and then compacted with the vibrating roller to consolidate the repair.

The plant operator was a Green Lane Association member with the necessary qualifications to work on the public highway.