Capel Curig repairs, Snowdonia
In partnership with Conwy Highways ruts were filled with quarry waste provided at a lay-by on the A5 Holyhead road. Loaded by mini digger onto military trailers, stone was then taken to site. Drainage ditches were cleared and a large rock removed at the Capel Curig end which had become exposed by persistent rainfall but subsequently made the road almost impassable.